Reconstruction of the railway line on the Kraków Płaszów – Podbory Skawińskie section

The implementation of the task titled “Preparation of design documentation and execution of construction works on the Kraków Płaszów – Podbory Skawińskie section as part of the project titled ‘Works on railway line No. 94 on the Kraków Płaszów – Skawina – Oświęcim section’ from km 1.925 to km 20.225 of railway line No. 94 and from km 6.500 to km 8.276 of line No. 603” was carried out under the “design and build” system on behalf of the General Contractor – Swietelsky Rail Polska Sp. z o.o.

 

The investor of the project was PKP Polskie Linie Kolejowe S.A.

 

The project was implemented from July 2017 to August 2022.

As part of the project, the following studies were comprehensively prepared:

Challenges posed by the project: